Axeon Grundfos MQ-Series Manual de usuario Pagina 14

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 68
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 13
14
English (US)
8.5 Start-up
Before start-up, the pump must be filled with
1.2 to 1.5 gallons of water to enable it to self-
prime, see fig. 14. The pump is self-priming
with a maximum suction lift of 25 ft.
Fig. 14 Priming the pump
When started, the pump begins to self-prime.
When it has been primed, the pump will auto-
matically change over to normal operation.
If the priming has not been completed within
5 minutes, the pump will stop automatically
and attempt to restart after 30 minutes. It is
possible to reset the pump manually, see point
2 in the table of section 9.1 Control panel.
TM01 9696 2600
Grundfos.book Page 14 Monday, May 23, 2011 10:17 AM
Vista de pagina 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 67 68

Comentarios a estos manuales

Sin comentarios